Apply now »
Employment Type:  Full Time
Employment Period: 
Salary:  38000
Location: 

London, GB, EC2R 7BP Bristol, GB, BS32 4TP Leiston, GB, IP16 4TP Felixstowe, GB, IP10 0DD

Career Area:  Nuclear Development

Document Controller

Location: London or Bristol (3 days a week)

 

Contract: Permanent, full-time. 

 

Salary: £32,000 - £38,000, dependant on experience. 

 

Benefits include: 

 

  • 5% Bonus
  • Pension up to 15% employer contribution
  • 28 days annual leave plus bank holidays
  • Wide range of flexible benefits

 

Closing date: Friday 24th April 2026

 

About Sizewell C

 

Sizewell C is one of the UK’s most significant infrastructure projects, delivering low‑carbon energy for generations. Joining us means contributing to a project of national importance, supporting energy security, regional growth, and long-term skilled employment.

 

The Role

 

We are seeking an experienced Document Controller to join the Sizewell C project team. You will play a critical role in managing and maintaining the integrity of project documentation across all phases of construction and operation. Working closely with engineering, construction, and quality teams, you’ll ensure all documentation is accurate, up-to-date, and compliant with regulatory and project requirements.

 

The Skills

  • Proven experience in document control within large infrastructure or construction projects.
  • Familiarity with nuclear, energy, or other regulated industries is highly desirable.
  • Proficiency in using document management software (e.g. Teamcenter, Asite, ProjectWise Web, SharePoint, etc.).
  • Strong organisational and communication skills.
  • Attention to detail and the ability to work to tight deadlines.
  • Knowledge of ISO standards for documentation is a plus.

 

Why Join?

 

This is a rare opportunity to take on a leadership role in a nationally significant project that will deliver low-carbon energy to millions of homes for decades to come.

 

You will operate at the heart of the programme, shaping engineering strategy, influencing delivery and working alongside some of the most experienced professionals in the industry.

 

Work in a mission-driven environment that values innovation, integrity, and long-term sustainability.

 

Competitive salary, comprehensive benefits, and opportunities for career development.

 

Flexible and hybrid working options.

 

 

Behavioural Competencies 

 

Humility  

Recognise the value brought from different cultures and experiences 

Be open to other’s points of view and ideas, be willing to debate and to compromise 

 

Positivity 

Positively challenge poor quality and performance 

Identify solutions at the lowest possible level 

Encourage tier 1s and others to bring new ideas forward 

 

Respect 

Value the rules and environment in which we operate  

Give and receive feedback with respect  

Embrace and engage with new people and ideas 

 

Solidarity 

One team, working closely together and helping each other 

Empowered teams always looking forward. 

Shared responsibility for delivery the project outcomes 

 

Clarity 

Communicate clearly and consistently  

Promote collaboration and team alignment  

Clearer and faster decision making  

Drive simplification at all levels 

 

Contextual Information 

 

Sizewell C’s business is to design, finance, construct, commission, operate, maintain and eventually decommission the nuclear power plant and related infrastructure at Sizewell C in Suffolk. Overall, whilst the Company is in the construction phase, the Boards’ principal focus is on the development and construction of Sizewell C on time, on budget and to the highest quality and safety standards. The Company is maturing to meet all these requirements.  

 

Sizewell C is economically regulated by OFGEM under the RAB model similar to other UK electricity distribution networks and Thames Tideway.  

 

Sizewell C construction strategy is to replicate the design of Hinkley Point C, using the majority of the same supply chain, but innovating in the way it is delivered to achieve savings in time and cost of around 20%.

 

The CCO will need to be guided by and incorporate lessons learned from the Hinkley Point C commercial delivery to achieve Sizewell C’s ambition. 

 

Following Financial Completion and Revenue Commencement, Sizewell C is fully funded and is owned by; The Secretary of State for Energy Security and Net Zero representing HM Government, La Caisse, Centrica, EDF and Amber Infrastructure.  

 
If this sounds like the next step in your career, we’d love to hear from you. Apply today. 


Job Segment: Sustainability, Nuclear Engineering, Document Control, Document Management, Nuclear, Energy, Engineering, Administrative, Technology

Apply now »